West Vancouver Pool Demolition

Location: West Vancouver, British Columbia
Date: 2023

A concrete pool along the high water mark of Burrard Inlet was removed to restore the shoreline at a private residence. This required a delicate approach to ensure environmental protection, and Lake Trail Inc was there to prepare a Construction Environmental Management Plan (CEMP) and environmental oversight for demolition.